Question No: 41

Which two tasks can you perform from both the Microsoft Dynamics Sure Step Client on- premise application and the Sure Step Online application? (Each correct answer presents part of the solution. Choose two.)

  1. Create and save project repositories the same as they are saved by using the Microsoft Dynamics Sure Step Client Project Creation Wizard.

  2. Import a Sure Step project.

  3. Access the lists of document templates in the Documents menu.

  4. Clone a Sure Step project.

  5. Navigate the reference material in the Methodology menu.

Answer: C,E

Question No: 42

You must complete a Requirements and Process Review during an engagement. What should you identify and document at the completion of the exercise?

  1. implementation approaches and associated costs

  2. customer requirements and business processes within the scope

  3. degree of fit to the business

  4. infrastructure and hardware requirements

Answer: B

Explanation: http://download.microsoft.com/download/4/3/D/43D4FED9-54DC-4B3B- 95B6-B17A15D1CB8F/03-DA-CRM_Datasheet_Oct-2011.pdf

Question No: 43

You are responsible for creating and managing projects in a project repository.

Which two actions can you perform on existing projects in the repository? (Each correct answer presents part of the solution- Choose two.)

  1. clone a project

  2. share a project

  3. change a project type

  4. delete a project

Answer: A,D

Ensurepass 2017 PDF and VCE

Explanation: The project properties tab is also used to create new projects, clone projects, and delete projects.

http://blogs.msdn.com/b/project/archive/2007/02/24/deliverables.aspx

Question No: 44

Go live is complete, and you are now in theoperation phase of the project.

Which two activities can be performed in the operations phase? (Each correct answer presents part of the solution. Choose two.)

  1. Document lessons learned.

  2. Review deliverables against the statement of work (SOW).

  3. Perform end-user training.

  4. Conduct production audit.

Answer: A,B

Explanation: B: You can find the following activities in the Operations phase:

/Project Planning

/ Provide Post Go Live Support

/ Transition of Solution to Support

/ (B) Review Deliverables against SOW and Agreed Changes

/ Conduct Performance Tuning and Optimization

A: Project Planning

The purpose of the Project Planning activity in the Operations phase is to closethe project after Go-Live and complete final project tasks.

You want to make sure that you delivered as promised, and that the customer is satisfied with the project outcome. This activity consists of the following tasks:

/ Finalize the project plan to accurately reflect the timeline, resourcesand milestones completed.

/ Complete the final project activities required to complete asuccessful closure of the project, such as:

  1. Document lessons learned.

    Finish any documentation promised to the customer in the statement of work (SOW) Determine the need for and conducting additional end-user training, if it is required. Perform a final knowledge transfer to the customer

    Clear any pending items that are discovered before, during, andafter Go-Live. http://technet.microsoft.com/en-us/library/aa496439.aspx

    Question No: 45

    Which two activities are specific to the agile project type? (Each correct answer presents part of the solution. Choose two.)

    1. define solution backlog

    2. sprint configuration and development

    3. gather development standards

    4. validate design security

    Answer: A,B

    Explanation: A: Some Agile project type activities are performed against the Sprint Backlog, which is a compiled list of requirements from the Solution Backlog that is broken into smaller increments of product features.

    B: The Sure Step Agile project type has Sprint cycles to encompass the Analysis, Design and Development phases.

    The Agile project type does have two phases, Deployment and Operation, at the culmination of the Spring cycles.

    http://www.ehow.com/info_8258730_principles-agile-project-management.html http://www.ehow.com/way_5418577_agile-project-management-methods.html http://social.technet.microsoft.com/wiki/contents/articles/5768.microsoft-dynamics-sure- step-agile-implementation.aspx

    Question No: 46

    You need to illustrate the dimensions of the project management diamond. Which dimension should you place at the center of the diamond?

    1. quality

    2. cost

    3. time

    4. expectations

    5. scope

    Answer: D

    Explanation: Quality, time, cost and scope can be interpreted as project constraints.

    Reference: http://blogs.msdn.com/b/project/default.aspx?PageIndex=1amp;PostSortBy=MostViewed http://www.betterprojects.net/2009/03/it-used-to-be-iron-triangle.html

    http://en.wikipedia.org/wiki/File:PM_DiamondModel.jpg

    Question No: 47

    The diagnostic phase includes which two deliverables? (Each correct answer presents part of the solution. Choose two.)

    1. risk and issues register

    2. high-level project charter

    3. solution design document

    4. statement of work

    Answer: B,D

    Explanation: Diagnostic Phase Purpose

    To gather enough information to define the high-level project charter and make a confident proposal for the implementation phases. The Diagnostic phase startsduring the sales process and ends with an accepted proposal and statement of work (SOW) for the next part of the implementation project. The major deliverablefor this phase is the SOW and the Budgetary Estimate Proposal.

    Deliverables

  2. High-Level Project Charter High-Level Project Plan

(D) Statement of Work Budgetary Estimate Proposal

[Optional] Decision Accelerator Deliverables, including Customer Reports Milestones

Customer accepts the SOW and the Budgetary Estimate Proposal, including the high-level project charter and high-level project plan.

http://technet.microsoft.com/en-us/library/aa496439.aspx

Question No: 48

What is copied into the sprint backlog within each sprint cycle?

  1. requirements subset

  2. technical review

  3. solution testing

  4. daily build

Answer: A

Explanation: The development phase in agile execution operates according to a Scrum development model. The life cycle is divided to 30-days sprint cycles and daily sprint cycle contains analysis, design, coding implementation and end up with solution test, and finalizing product specification.

Here is how it goes;

->Solution Backlog: where the solution feature list is listed

->Release Backlog: where identify and prioritize set of features to be developed during 30 day sprint, and identify each feature time estimation (story point),

->Sprint Backlog: is the breakdown of release backlog according to feature priority and estimation it could be 3-days to one month (daily sprint)

->User story: where descript feature business function, users (roles), and test script (less documentation)

->Defect Backlog: where identify and reporting system bugs

->Standup daily meeting: what we did (status), and what we have today

http://social.technet.microsoft.com/wiki/contents/articles/5768.microsoft-dynamics-sure- step-agile-implementation.aspx

Question No: 49

Which statement is an objective of solution envisioning?

  1. Create and approve a Fit Gap Analysis.

  2. Complete a functional design for a solution.

  3. Finalize and approve a project plan.

  4. Understand solution requirements.

Answer: D

Explanation: http://social.technet.microsoft.com/wiki/contents/articles/18503.implement- microsoft-dynamics-nav.aspx

Question No: 50

Which activity may be included in project closure?

  1. Provide additional user training.

  2. Establish ongoing quality and testing strategy.

  3. Conduct a disaster recovery test.

  4. Review the scope and change requests.

Answer: A

Explanation: Additional Operation Activities

In additional to Quality Management activities, there are other activities recommended in theOperation phase. Depending on the project type and needs, these may include the following:

->Provide Post Go-Live Support

->Transition of Solution to Support

->Review Deliverables against SOW and Agreed Changes

->Establish Ongoing Quality and Testing Strategy

->Conduct Disaster Recovery Test

->Conduct Performance Tuning and Optimization Ref:http://www.tud.ttu.ee/material/enn/IDU0010/Loeng5CRM/80235A_MSS2010_ENUS_C RM/80235A_MSS2010_ENUS_CRM/MSS2010_ENUS_CRM_05.pdf

100% Free Download!
Download Free Demo:MB5-705 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass MB5-705 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

[Free] 2017(Sep) EnsurePass Testinsides Microsoft MB5-705 Dumps with VCE and PDF 31-40

EnsurePass
2017 Sep Microsoft Official New Released MB5-705
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/MB5-705.html

Managing Microsoft Dynamics Implementations

Question No: 31

You completed a Decision Accelerator Offering and need to document the key conclusions. Which group of documents should you use?

  1. process review documents

  2. efficiency instruments

  3. customer sign-off documents

  4. validation documents

Answer: A

Reference:http://download.microsoft.com/download/3/1/E/31EB40F6-AF51-4975-8D1C- 52E323C8492A/01-DA-AX_Datasheet_Oct-2011.pdf

http://blogs.msdn.com/b/mvpawardprogram/archive/2012/08/27/microsoft-dynamics-sure- step-methodology-revisited.aspx

http://technet.microsoft.com/en-us/library/aa496439.aspx

Question No: 32

You are preparing to go live with an implementation.

What is the final milestone that you should perform before the implementation goes live?

  1. end-user training

  2. user acceptance testing

  3. performance testing

  4. final system readiness

Answer: D

Explanation: http://technet.microsoft.com/en-us/library/cc526670.aspx

The Release Readiness Review is the final management checkpoint and approval stage before the release team begins detailed rollout planning and preparations. The Release Readiness Review results in a go/no-go decision about whether to deploy the release.

Question No: 33

You need to createaproject management diamond. Which constraints should you use at each corner?

  1. cost, quality, scope, risk

  2. expectations, scope, time, risk

  3. cost, expectations, scope, time

  4. cost, quality, scope, time

Answer: D

Reference:http://en.wikipedia.org/wiki/File:PM_DiamondModel.jpg

Question No: 34

You are a project manager implementing a Microsoft Dynamics solution.

The customer business processes are not complex, and a business process mapping is not required.

You need to select the appropriate project type for this customer. Which project type should you choose?

  1. rapid

  2. agile

  3. enterprise

  4. standard

Answer: A

Explanation: Rapid Implementation: an accelerated approach for implementing Microsoft Dynamics with minimal or no customizations. This can be used in situations characterized by a limited scope where the basic application features are desired, and/or where the large majority of the customer’s business processes are not considered as complex.

References:

http://www.ignify.com/ERP-Implementation-Methodology.asp

Question No: 35

Which two activities are objectives of a project closure? (Each answer presents part of the solution. Choose two.)

  1. Document the changes in scope.

  2. Obtain formal sign-off on all deliverables.

  3. Ensure that the client is satisfied with the project outcome.

  4. Communicate budget status.

Answer: B,C

Explanation: B: After go-live and some additional support, you ask the customer to sign off for the delivery of the project, and once signed, your project is closed.

C: Formalize the acceptance of the product, service or result as well as to perform project closure.

http://technet.microsoft.com/en-us/library/bb497043.aspx Customer Sign-off

The solutions key stakeholders review the collateral and solution and confirm it is ready for deployment. The project team prepares an affidavit reiterating that the key stakeholders have reviewed the solution and the accompanying collateral, and that they find the solution to be final and acceptable as it is.

Question No: 36

You are managing a Microsoft Dynamics implementation project.

Your customer does not agree with a decision made by a project team member. He approaches you because he does not know who to escalate the issue to.

Which common challenge are you experiencing with this project?

  1. scope creep

  2. unclear roles and accountabilities

  3. underestimated complexity and dependencies

  4. uninvolved customer

Answer: B

Question No: 37

Which customer role is involved in the Fit Gap and Solution Blueprint Decision Accelerator?

  1. project manager

  2. key user

  3. business decision maker

  4. executive sponsor

Answer: C

Reference:http://download.microsoft.com/download/3/a/c/3ac11404-03a8-4d55-9b90- f789286a4f34/Fit_Gap_Datasheet.pdf

http://blogs.msdn.com/b/mvpawardprogram/archive/2012/08/27/microsoft-dynamics-sure- step-methodology-revisited.aspx

http://technet.microsoft.com/en-us/library/aa496439.aspx

Question No: 38

Which two categories should be used for requirements in the Fit Gap Analysis spreadsheet? (Each correct answer presents part of the solution. Choose two.)

  1. additional purchase

  2. configuration

  3. gap

  4. standard feature

Answer: B,D

Explanation: * After completing the first round of Fit Gap Analysis, you get two figures: the degree of fit expressed in percentages, and the total estimate of the number of hours used for configuration, customization and deployment of ISV add-ons.

  • If the degree of fit is high, but the budget is still not reached, you can even skip the configuration features. Even though a requirement can be met with a standard feature through configuration, if that configuration is taking a lot of time, you might decide to skip it, especially if the importance is fairly low.

  • References:

    http://download.microsoft.com/download/3/a/c/3ac11404-03a8-4d55-9b90-

    f789286a4f34/Fit_Gap_Datasheet.pdf http://vjeko.com/blog/fit-gap-and-solution-blueprint-estimates

    Question No: 39

    During which phase of a waterfall delivery is the creation and delivery of a complete system configuration performed?

    1. data migration

    2. development

    3. design

    4. analysis

    Answer: B

    Explanation: http://en.wikipedia.org/wiki/Waterfall_model http://blogs.msdn.com/b/dpe_nigeria/archive/2012/06/13/new-tfs-template-available-quot- agile-dev-in-a-waterfall-environment-quot-govdev.aspx

    Question No: 40

    You are a project manager for Contoso Ltd, an e-commerce company.

    Contoso#39;s Microsoft Dynamics implementation project is in the deployment phase, and you are planning the user acceptance testing.

    Which action should be the focus of the testing?

    1. testing the performance to ensure the system can handle the predicted peak time transaction volumes

    2. testing that the system supports the company#39;s transaction data

    3. testing data migration

    4. testing the end-to-end system to ensure the system supports the company#39;s transactions

    Answer: D

    Explanation: Chapter 5 – Stabilizing Phase http://technet.microsoft.com/en-us/library/bb497042.aspx

    100% Free Download!
    Download Free Demo:MB5-705 Demo PDF
    100% Pass Guaranteed!
    Download 2017 EnsurePass MB5-705 Full Exam PDF and VCE

    EnsurePass ExamCollection Testking
    Lowest Price Guarantee Yes No No
    Up-to-Dated Yes No No
    Real Questions Yes No No
    Explanation Yes No No
    PDF VCE Yes No No
    Free VCE Simulator Yes No No
    Instant Download Yes No No

    2017 EnsurePass IT Certification PDF and VCE

    [Free] 2017(Sep) EnsurePass Testinsides Microsoft MB5-705 Dumps with VCE and PDF 21-30

    EnsurePass
    2017 Sep Microsoft Official New Released MB5-705
    100% Free Download! 100% Pass Guaranteed!
    http://www.EnsurePass.com/MB5-705.html

    Managing Microsoft Dynamics Implementations

    Question No: 21

    What functionality does Microsoft Dynamics Sure Step provide?

    1. It provides an online toolkit of how to configure Microsoft Dynamics Solutions.

    2. It enables Microsoft Dynamics partners to better serve their customers when implementing Microsoft Dynamics products.

    3. It provides the only way to implement Microsoft Dynamics AX 2012.

    4. It provides Microsoft Dynamics customers project management strategies for the Microsoft Dynamics implementations phase of their project.

    Answer: B

    Explanation: “Sure Step is designed to enable the solution provider to better serve customers by helping reduce their Microsoft Dynamics total cost of ownership” Reference:http://community.dynamics.com/crm/b/lostinthoughtsofcrm/archive/2012/03/17/ microsoft-dynamics-sure-step-2012-and-sure-step-online.aspx

    Question No: 22

    You are a project manager working with a client who has specific feature needs, moderate to complex customizations, and minimal business process mapping completed.

    You need to recommend a project type for the client. Which project type should you recommend?

    1. agile

    2. enterprise

    3. standard

    4. rapid

    Answer: A Explanation:

    Agile Implementation: Uses an iterative, incremental process for developing Microsoft Dynamics Solutions. This project gives customer greater control over the final solution because customers can quickly change the direction of the solution from one sprint cycle to next.Typically used at a single site requiring specific features and moderate to complex customizations.

    References:

    http://www.ignify.com/ERP-Implementation-Methodology.asp http://social.technet.microsoft.com/wiki/contents/articles/5768.microsoft-dynamics-sure- step-agile-implementation.aspx

    Question No: 23

    You are responsible for using the Sure Step Project Creation Wizard to create projects that involve multiple products, Decision Accelerators, and project types.

    Which constraint do you need to consider?

    1. A project can contain multiple Decision Accelerators.

    2. A project can contain multiple products.

    3. A project can be associated with multiple project types.

    4. The project repository can only contain 100 active projects at a time.

    Answer: A

    Question No: 24

    Which two characteristics describe the agile project type? (Each correct answer presents part of the solution. Choose two.)

    1. starts with preparation and execution

    2. starts with analysis, design, and development

    3. sequential

    4. iterative

    Answer: B,D

    Explanation: B: The Agile Project type has Sprint cycles to encompass the Analysis, Design and Development phases.

    D: A flexible and iterative approach to development, which is where the Agile Project type is ideally suited.

    Reference:http://en.wikipedia.org/wiki/Agile_management

    http://www.ehow.com/way_5418577_agile-project-management-methods.html http://www.ehow.com/info_8258730_principles-agile-project-management.html

    http://social.technet.microsoft.com/wiki/contents/articles/5768.microsoft-dynamics-sure- step-agile-implementation.aspx

    Question No: 25

    You complete your project planning.

    You need to continue with the agile preparation stage of the project. Which activity should you do first?

    1. Gather business requirements.

    2. Conduct a Fit Gap Analysis.

    3. Conduct a solutions overview.

    4. Define a solution backlog.

    Answer: C

    Question No: 26

    You are performing the solution envisioning process with a customer.

    The customer requests that you use all of the Decision Accelerator Offerings. What is the first step you should use in the process?

    1. architecture assessment

    2. Fit Gap and Solution Blueprint

    3. requirements and process review

    4. scoping assessment

    Answer: C

    Explanation: http://download.microsoft.com/download/4/3/D/43D4FED9-54DC-4B3B- 95B6-B17A15D1CB8F/03-DA-CRM_Datasheet_Oct-2011.pdf http://blogs.msdn.com/b/mvpawardprogram/archive/2012/08/27/microsoft-dynamics-sure- step-methodology-revisited.aspx

    http://technet.microsoft.com/en-us/library/aa496439.aspx

    Question No: 27

    You are a project manager and you are using the waterfall delivery for a project.

    Which two items must be completed within the development phase? (Each correct answer presents part of the solution. Choose two.)

    1. project design

    2. custom coding

    3. analysis phase

    4. production specifications

    5. design phase

    Answer: A,B

    Explanation: * The goal of the Development phase is to build and test the system components defined and approved in the design specifications, including developing the customizations, integrations and interfaces, and data migration processes.

    Ensurepass 2017 PDF and VCE

    *

    http://en.wikipedia.org/wiki/Waterfall_model http://blogs.msdn.com/b/dpe_nigeria/archive/2012/06/13/new-tfs-template-available-quot- agile-dev-in-a-waterfall-environment-quot-govdev.aspx

    Question No: 28

    You are performing a new Microsoft Dynamics GP implementation for a customer who has 10 users. The customer does not want to use customizations or independent software vendor (ISV) solutions. Which project type should you use to deliver the implementation?

    1. rapid

    2. standard

    3. agile

    4. enterprise

    Answer: A

    Explanation: Rapid Implementation: an accelerated approach for implementing Microsoft

    by a limited scopewhere the basic application features are desired, and/or where the large majority of the customer’s business processes are not considered as complex.

    RAPID – a proven framework to accelerate and de-risk implementations by delivering standard deliverables out of the box cutting down the overall implementation time significantly. RAPID stands for Ready to use And Proven Implementation Deliverables.

    Reference:

    http://www.ignify.com/ERP-Implementation-Methodology.asp http://www.ehow.com/info_8258730_principles-agile-project-management.html

    Question No: 29

    Which item is a project management process?

    1. communication

    2. risk

    3. initiation

    4. integration

    Answer: C Explanation:

    According to Wikipedia the Project Management phases are: Initiation; Planning or design; Production or execution; Monitoring and controlling; as well as Closing.

    References: http://en.wikipedia.org/wiki/Project_management

    Question No: 30

    Which two activities are included in the Diagnostic phase? (Each correct answer presents part of the solution. Choose two.)

    1. Gather the development standards.

    2. Conduct an architecture assessment,

    3. Present a solution overview.

    4. Finalize the product specification.

    Answer: C,D Explanation:

    ->Evaluate a customer#39;s business processes and infrastructure

    ->Assist the customer with their due diligence cycle, including ascertaining requirements and their fit with the solution, and assessing the resource needs for the solution delivery

    ->Prepare the project plan, proposal, and the Statement of Work http://technet.microsoft.com/en-us/library/aa496439.aspx

    / Diagnostic Phase Purpose

    To gather enough information to define the high-level project charter and make a confident proposal for the implementation phases. The Diagnostic phase startsduring the sales process and ends with an accepted proposal and statement of work (SOW) for the next part of theimplementation project. The major deliverablefor this phase is the SOW and the Budgetary Estimate Proposal.

    Deliverables

    High-Level Project Charter High-Level Project Plan Statement of Work Budgetary Estimate Proposal

    [Optional] Decision Accelerator Deliverables, including Customer Reports Milestones

    Customer accepts the SOW and the Budgetary Estimate Proposal, including the high-level project charter and high-level project plan.

    / The Diagnostic phase of the Sure Step Methodology occurs during the sales and due diligence stage of the engagement lifecycle. For this phase, the Sure Step Methodology provides seven top-level Decision Accelerator offerings to assist the customer in their decision-making process for an ERP or CRM solution.

    This phase also includes activities for Proposal Generation, Finalization of Agreements, and Project Mobilization, and sets the stage for a successful implementation.

    [Free] 2017(Sep) EnsurePass Testinsides Microsoft MB5-705 Dumps with VCE and PDF 11-20

    EnsurePass
    2017 Sep Microsoft Official New Released MB5-705
    100% Free Download! 100% Pass Guaranteed!
    http://www.EnsurePass.com/MB5-705.html

    Managing Microsoft Dynamics Implementations

    Question No: 11

    Which document is used in the Microsoft Dynamics Sure Step Methodology to document project risks?

    1. risk category

    2. risk register

    3. risk response strategies

    4. risk analysis

    Answer: B

    Question No: 12

    What is the maximum time allocated to a developer task within a sprint cycle?

    1. 8 hours

    2. 16 hours

    3. 1 day

    4. 30 days

    Answer: B

    Explanation: http://blogs.msdn.com/b/visualstudioalm/archive/2014/03/03/sample-chapter- scrum-agile-practices-and-visual-studio-from-the-book-adopting-agile-software-practices- from-backlog-to-continuous-feedback-edition-3.aspx#_top

    The development phase in agile execution operates according to a Scrum development model. The life cycle is divided to 30-days sprint cycles and daily sprint cycle contains analysis, design, coding implementation and end up with solution test, and finalizing product specification.

    Here is how it goes;

    ->Solution Backlog: where the solution feature list is listed

    ->Release Backlog: where identify and prioritize set of features to be developed during 30 day sprint, and identify each feature time estimation (story point),

    ->Sprint Backlog: is the breakdown of release backlog according to feature priority and estimation it could be 3-days to one month (daily sprint)

    ->User story: where descript feature business function, users (roles), and test script (less documentation)

    ->Defect Backlog: where identify and reporting system bugs

    ->Standup daily meeting: what we did (status), and what we have today

    Ensurepass 2017 PDF and VCE

    http://social.technet.microsoft.com/wiki/cfs-filesystemfile.ashx/ key/communityserver- wikis-components-files/00-00-00-00-05/3022.Sure-Step-Agile-Implementation.jpg

    Ensurepass 2017 PDF and VCE

    clip_image005

    http://social.technet.microsoft.com/wiki/contents/articles/5768.microsoft-dynamics-sure- step-agile-implementation.aspx

    Question No: 13

    You need to create a project by using the Sure Step Project Creation Wizard.

    Which two properties must you identify in order to proceed? (Each correct answer presents part of the solution. Choose two.)

    1. engagement type

    2. product

    3. project implementation phase

    4. product version

    Answer: A,B

    Explanation: 1. In the Microsoft Dynamics Sure Step main window, click the Projects tab.

    1. Click Project List, and then click Create New Project.

    2. On the Sure Step Project Creation Wizard welcome page, click Next.

      Ensurepass 2017 PDF and VCE

    3. On the “Add new project data” window, choose a Solution, Product, and Engagement Type. Type your project name and optionally fill in the rest of the fields. Click Next to continue.

      Etc.

      http://blogs.msdn.com/b/ukax/archive/2012/01/10/sure-step-online-project-wizard.aspx

      Question No: 14

      You are a project manager for a technology consulting company.

      Your team is finalizing a commercial engagement proposal for presentation and sign-off. In conjunction with the engagement manager, you need to provide details for the proposal.

      Which two details should you provide? (Each correct answer presents part of the solution. Choose two.)

      1. functional details

      2. project scope details

      3. technical details

      4. the licensing and service contract agreements

      5. the statement of work

    Answer: D,E

    Explanation: http://technet.microsoft.com/en-us/aa699451.aspx

    Question No: 15

    You are a project manager. You use the classic triple constraint model. If one constraint is changed, what happens to the other constraints?

    1. The project#39;s quality constraint will change.

    2. The project#39;s expectations constraint will change.

    3. At least one of the other constraints must also change.

    4. The customer#39;s benefits constraint will change.

    Answer: C

    Reference:http://www.tonyadamspm.com/2012/07/quality-challenging-the-pm-triple- constraint/

    Question No: 16

    You are preparing for a go live cutover.

    You need to create the go live cutover document. Which items should you add to the document?

    1. the operational and support activities for production operations

    2. the detailed process steps to be included in the cutover

    3. the details of the production environment and disaster recovery information

    4. a high-level overview of cutover activities and those involved

    Answer: B

    Explanation: Chapter 8 – Planning Phase: Creating the Project Plans http://technet.microsoft.com/en-us/library/bb497050.aspx

    Question No: 17

    You are a project manager.

    You create a work breakdown structure (WBS).

    What is the next step when you use the Microsoft Dynamics Sure Step Methodology resource management techniques?

    1. Plan material resources that will be needed.

    2. Plan and use the plan-do-check-act cycle.

    3. Plan and collect the project requirements.

    4. Plan and schedule stakeholder project reviews.

    Answer: A

    Explanation: http://technet.microsoft.com/en-us/library/hh227544.aspx

    Question No: 18

    You are a project manager. You are running a project by using the waterfall delivery method. The project is in the development phase. Which Microsoft Dynamics Sure Step Methodology supplemental documents are created to support the training?

    1. performance test documents

    2. data migration documents

    3. user test documents

    4. user guides

    Answer: D

    Explanation: http://en.wikipedia.org/wiki/Waterfall_model http://blogs.msdn.com/b/dpe_nigeria/archive/2012/06/13/new-tfs-template-available-quot- agile-dev-in-a-waterfall-environment-quot-govdev.aspx

    Question No: 19

    You are explaining Sure Step’s approach to project management to a colleague. Which definition should you use?

    1. Project management is an approach to guide the development of project scope.

    2. Project management is an approach to plan project scheduling at the beginning of the project.

    3. Project management is an approach to plan and guide project processes from start to finish.

    4. Project management is an approach to monitor and measure project progress to identify variances from the plan.

    Answer: C

    Explanation: http://technet.microsoft.com/en-us/library/aa496439.aspx

    Operations Review Team Role Matrix http://technet.microsoft.com/en-us/library/cc526647.aspx Deliver Phase Overview

    http://technet.microsoft.com/en-us/library/cc543223.aspx

    envisioning phase

    http://technet.microsoft.com/en-us/library/bb497039.aspx

    Question No: 20

    You are a project manager, and you use Microsoft Dynamics Sure Step for implementations of Microsoft Dynamics products for your customers.

    Your customer#39;s major stakeholders identify significant changes that will increase the scope of a project.

    Which two risk response strategies for the project definition update should you use? (Each correct answer presents part of the solution, Choose two.)

    1. Exploit

    2. Avoid

    3. Enhance

    4. Transfer

    5. share

    Answer: B,D

    100% Free Download!
    Download Free Demo:MB5-705 Demo PDF
    100% Pass Guaranteed!
    Download 2017 EnsurePass MB5-705 Full Exam PDF and VCE

    EnsurePass ExamCollection Testking
    Lowest Price Guarantee Yes No No
    Up-to-Dated Yes No No
    Real Questions Yes No No
    Explanation Yes No No
    PDF VCE Yes No No
    Free VCE Simulator Yes No No
    Instant Download Yes No No

    2017 EnsurePass IT Certification PDF and VCE

    [Free] 2017(Sep) EnsurePass Testinsides Microsoft MB5-705 Dumps with VCE and PDF 1-10

    EnsurePass
    2017 Sep Microsoft Official New Released MB5-705
    100% Free Download! 100% Pass Guaranteed!
    http://www.EnsurePass.com/MB5-705.html

    Managing Microsoft Dynamics Implementations

    Question No: 1

    Which document is generated as a result of the functional requirements document (FRD)?

    1. solution design document (SDD)

    2. Fit Gap Analysis worksheet

    3. functional design document (FDD)

    4. technical design document (TDD)

    Answer: B

    Explanation: References:

    http://dynamicsblog.wordpress.com/2008/10/30/whats-new-in-sure-step-functional- requirements-document/

    http://download.microsoft.com/download/3/a/c/3ac11404-03a8-4d55-9b90- f789286a4f34/Fit_Gap_Datasheet.pdf

    http://vjeko.com/blog/fit-gap-and-solution-blueprint-estimates

    Question No: 2

    Which document should you use to manage project deliverables?

    1. project scope statement

    2. project objectives

    3. technical requirements

    4. functional requirements

    Answer: A

    Question No: 3

    Which activity is associated with planning communication management?

    1. assigning the project team

    2. conducting team meetings

    3. developing the project schedule

    4. conducting the kickoff meeting

    Answer: D

    Question No: 4

    Which two basic support tools do you have at your disposal to support quality control for high-quality requirements or complex project environments? (Each correct answer presents part of the solution. Choose two.)

    1. flow charts

    2. cause and effect diagrams

    3. plan-do-check-act cycles

    4. tollgate reviews

    5. conditions of satisfaction (COS)

    Answer: A,E

    Explanation: A: Microsoft Dynamics Sure Step also many process flow diagrams that visually illustrate each phase in the implementation process.

    E: Sure Step has specific examples regarding Conditions of Satisfaction, which of course will need to be adapted to individual projects.

    Reference:

    http://download.microsoft.com/download/D/B/F/DBF707F1-0C4A-4BA7-9E86- FBF9E05CB70D/MicrosoftDynamicsResourcesforFaculty.pdf

    Question No: 5

    As a project manager, you need to ascertain which human resources are involved in the project and Fit Gap documents on the Decision Accelerators.

    Which two Microsoft Dynamics Sure Step Methodology tree nodes provide this information for the implementation project? (Each correct answer presents part of the solution. Choose two.)

    1. Solution Envisioning

    2. Resources

    3. Roles

    4. Deliverables

    5. Preferences

    Answer: B,C Explanation: References:

    http://download.microsoft.com/download/3/a/c/3ac11404-03a8-4d55-9b90- f789286a4f34/Fit_Gap_Datasheet.pdf

    http://vjeko.com/blog/fit-gap-and-solution-blueprint-estimates http://blogs.msdn.com/b/mvpawardprogram/archive/2012/08/27/microsoft-dynamics-sure- step-methodology-revisited.aspx

    http://technet.microsoft.com/en-us/library/aa496439.aspx

    Question No: 6

    Which two activities are included in the Fit Gap and Solution Blueprint process flow? (Each correct answer presents part of the solution. Choose two.)

    1. Generate an implementation plan report.

    2. Lead requirements workshops with product demos.

    3. Conduct a project kickoff meeting.

    4. Configure a subset of business requirements.

    Answer: A,D Explanation: A: Fit Gap

    Your business requirements will be analyzed by using a Fit Gap worksheet, which shows clearly how well your Microsoft Dynamics solution matches your business needs and your existing structures and systems. You will know how Microsoft Dynamics AX or Microsoft Dynamics CRM can be adapted to fulfill your technical and functional requirements. At the end of the Fit Gap process, our consultants will work closely with your business and IT team members to validate the findings and help determine the next steps in implementation.

    D: Solution Blueprint

    Based on the Fit Gap findings, our consultants will prepare the Solution Blueprint, a comprehensive report on the conceptual and physical design of your solution. The report will provide clear guidance on how to meet your needs for systems integration, user interfaces, display graphics, and all the other factors that drive business performance.

    Finally, our consultants will present their findings and conclusions in person to key stakeholders at your enterprise and answer any questions that may arise. In sum, Fit Gap

    and Solution Blueprint will provide you with an analysis of how to customize and deploy your Microsoft Dynamics solution. In addition, the report will provide useful input for the next steps toward implementation.

    References:

    http://download.microsoft.com/download/3/a/c/3ac11404-03a8-4d55-9b90- f789286a4f34/Fit_Gap_Datasheet.pdf

    http://vjeko.com/blog/fit-gap-and-solution-blueprint-estimates

    Question No: 7

    You are delivering a project by using the waterfall delivery method. You approve the project charter and project plan.

    Which three actions should you do next? (Each correct answer presents part of the solution. Choose three.)

    1. Document the configuration of the overall Microsoft Dynamics solution.

    2. Create the deployment plan.

    3. Perform and document the Fit Gap Analysis.

    4. Complete the design specifications.

    5. Develop future state business process models.

    6. Conduct the Executive and Project Team kickoff meetings.

    Ensurepass 2017 PDF and VCE

    Answer: C,E,F Explanation:

    References:

    http://download.microsoft.com/download/3/a/c/3ac11404-03a8-4d55-9b90- f789286a4f34/Fit_Gap_Datasheet.pdf

    http://vjeko.com/blog/fit-gap-and-solution-blueprint-estimates

    Question No: 8

    What is an objective of diagnostic preparation?

    1. to lead an internal kickoff meeting

    2. to gain a preliminary understanding of the customer#39;s needs

    3. to plan the running of diagnostic accelerators

    4. to prepare high-level project documents

    Answer: B

    Explanation: http://technet.microsoft.com/en-us/library/aa496439.aspx

    Question No: 9

    You need to create a proposal for the final licensing and services agreement.

    Which two roles should be involved in creation of the proposal? (Each correct answer presents part of the solution. Choose two.)

    1. account manager

    2. project manager

    3. sales representative

    4. engagement manager

    Answer: B,D

    Explanation: B: Project Manager: The project manager is what the name suggests:the project manager. Heor shekeeps the project running, allocates resources, maintains the project plan, work break down structure and is the contact person for the Customers project manager. The Project manager has a representative function and coordinates meetings

    withseveralteam members

    D: Engagement Manager: The Engagement Manager participates only in the starting phase of a project. He is responsible to transfer a sales project into animplementation project.

    * Final Licensing and Services Agreement is an activity that you execute acrossmany phases of the project. The purpose of the activity in the Diagnostic phase isto document the overall scope of the implementation and gain the agreement ofthe customer. This activity produces two key deliverables:

    ->The Statement of Work (SOW), which details the scope of theimplementation.

    ->The Budgetary Estimate Proposal, which provides details of the costcomponents.

    The key benefits gained by performing this activity are:

    ->A presentation and walk through of the SOW and Budgetary Estimate Proposal.

    ->The opportunity for the customer to review and provide feedback onthe SOW and Budgetary Estimate Proposal before acceptance.

    http://technet.microsoft.com/en-us/aa699451.aspx

    Question No: 10

    Which project types does the Microsoft Dynamics Sure Step Model use?

    1. waterfall, iterative

    2. diagnostic, analysis, design, development, deployment, and operation

    3. standard, rapid, enterprise, agile, and upgrade

    4. diagnostic, development, and operational

    Answer: C Explanation:

    The standard set of templates available using Microsoft Dynamics Sure Step Model is standard, rapid, enterprise and agile.

    Reference:

    http://www.ignify.com/ERP-Implementation-Methodology.asp

    http://www.tud.ttu.ee/material/enn/IDU0010/Loeng3Sure_Step/80199A_ENUS_ERP/80199 A_ENUS_ERP/80199_ENUS_ERP_01.pdf(page 5)

    100% Free Download!
    Download Free Demo:MB5-705 Demo PDF
    100% Pass Guaranteed!
    Download 2017 EnsurePass MB5-705 Full Exam PDF and VCE

    EnsurePass ExamCollection Testking
    Lowest Price Guarantee Yes No No
    Up-to-Dated Yes No No
    Real Questions Yes No No
    Explanation Yes No No
    PDF VCE Yes No No
    Free VCE Simulator Yes No No
    Instant Download Yes No No

    2017 EnsurePass IT Certification PDF and VCE