[Free] 2017(Sep) EnsurePass Examcollection IBM C2010-655 V13 Dumps with VCE and PDF 151-160

EnsurePass
2017 Sep IBM Official New Released C2010-655 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-655 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 151 – (Topic 3)

Which criteria in the organization#39;s work orders Edit Rules rules options specifies when fieldvalues can be changed?

  1. a given work order status

  2. a given work order work type

  3. when given work order is Approved

  4. when given work order is in Workflow

Answer: A

Question No: 152 – (Topic 3)

When entering an asset#39;s reading for a Characteristic type of meter, which field must be entered?

  1. Meter Type

  2. New Reading

  3. Reading Type

  4. Asset Number

Answer: B

Question No: 153 – (Topic 3)

Which three actions are performed in the Quick Reporting application? (Choose three.)

  1. add work logs

  2. enter meter readings

  3. edit work order hi story

  4. report work order actual

  5. apply a route to a work order

  6. plan crafts and tools required for the work

Answer: B,D,E

Question No: 154 – (Topic 3)

How is a printing shortcut created when defining reports in the Report Administration application?

  1. assigns a keystroke using the Toolbar Properties field

  2. select the Add the Report to theToolbar icon and click Save

  3. select the Printing Shortcut check box and indicate the ASCII value of the hotkey

  4. select the Direct Print field and specify the number indicating the position of the icon on the toolbar

Answer: D

Question No: 155 – (Topic 3)

Which statement is true about creating a Service Level Agreement (SLA)?

  1. It is created based on asset collections listed in the asset inventory.

  2. It is created based on a Maximo business object to which it applies.

  3. It is created based on service requests initiated by the Work Orders application.

  4. It is created based on contract approvals specified in the Contracts and Warranties application.

Answer: B

Question No: 156 – (Topic 3)

In the Work Order Tracking application, which two actions create a value in the related records table? (Choose two.)

  1. Select Action gt; Create gt; Work Order

  2. Select Action gt;Duplicate Work Order

  3. Select Action gt; Create Work Package

  4. Select Action gt; Create gt; Communication

  5. Select Action gt; Create gt; Service Request

Answer: A,E

Question No: 157 – (Topic 3)

A purchase order must be in one of which two statuses to be edited? (Choose two.)

  1. EDIT

  2. NEW

  3. INPRG

  4. WAPPR

  5. PNDREV

Answer: D,E

Question No: 158 – (Topic 3)

In which applications can a domain be applied to an attribute?

  1. Application Designer, Classification, or Actions applications

  2. Classifications, Database Configuration, or Application Designer applications

  3. Classifications, Database Configuration, or Communication Templates applications

  4. Database Configuration, Communication Templates, or Application Designer applications

Answer: B

Question No: 159 – (Topic 3)

In the Receiving application, what are three standard values for the Inspection Status field?(Choose three.)

  1. APPR

  2. COMP

  3. WINSP

  4. CLOSE

  5. WAPPR

  6. WASSET

Answer: B,C,F

Question No: 160 – (Topic 3)

Preventive Maintenance (PM) work orders can be triggered by which two criteria? (Choose two.)

  1. Meter-based PMsbased on asset meter readings

  2. Time-based PMs based on elapsed time since previous work

  3. Unit measure-based PMs based on the threshold of the Unit of Measure application

  4. Asset-based PMs based on the status of the asset when it is moved in the maintenance storeroom

  5. Item Master-based PMs based on the status of the item when it is moved in the maintenance storeroom

Answer: A,B

100% Free Download!
Download Free Demo:C2010-655 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-655 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

[Free] 2017(Sep) EnsurePass Examcollection IBM C2010-655 V13 Dumps with VCE and PDF 141-150

EnsurePass
2017 Sep IBM Official New Released C2010-655 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-655 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 141 – (Topic 2)

When creating a purchase requisition, contracts of which two types can be referenced? (Choose two.)

  1. Blanket contract

  2. Warranty contract

  3. Purchase contract

  4. Labor Rate contract

  5. Lease/Rental contract

Answer: C,E

Topic 3, Volume C

Question No: 142 – (Topic 3)

How is an inventory item created?

  1. create the item in the Inventory application and specify the issue unit

  2. create the item in the Inventory application and add it to the storeroom

  3. create the item in the Item Master application and specify the issue unit

  4. create the item in the Item Master application and add it to the storeroom

Answer: D

Question No: 143 – (Topic 3)

Which application and action are accessed to add one or more values to the default Work Type list?

  1. Domains; add more values in the WORKTYPE domain

  2. Application Designer; add more values in the LOOKUPS.xml

  3. Database Configuration; add more values in the Work Type value list

  4. Organizations; add more values inthe Work Type list under the Work Order Options

Answer: D

Question No: 144 – (Topic 3)

What is the primarily purpose of an escalation?

  1. automate workflow processes

  2. monitor time sensitive records

  3. trigger scheduled reports or actions

  4. make automatic updates to records

Answer: B

Question No: 145 – (Topic 3)

When updating or modifying a Service Request the work log can be edited and viewed. Which field is mandatory in the Work Log tab of the Service Request application?

  1. Type

  2. Class

  3. Record

  4. Summary

Answer: A

Question No: 146 – (Topic 3)

Safety plans are used on which two IBM Maximo Asset Management V7.5 applications? (Choose two.)

  1. Assets

  2. Job Plans

  3. Work Orders

  4. Service Requests

  5. Preventive Maintenance

Answer: B,C

Question No: 147 – (Topic 3)

What is used to add an item to a storeroom using the Item Master application?

  1. the Add New Row button on the Vendors tab

  2. the Add New Row button on the Storerooms tab

  3. the Add Items To Storeroom in theSelect Action menu

  4. the Add Items To Storeroom in the Item Assembly Structure tab

Answer: C

Question No: 148 – (Topic 3)

What does the solutionlnstaller -action showinstalled -type all command do?

  1. displays the installed Maximo V7.5 packages, from the Deployment Engine view

  2. displays the installed Maximo V7.5 packages, from the Maximo System Information view

  3. displays the installed Maximo V7.5 and middleware packages, from the Deployment Engine view

  4. displays the installed Maximo V7.5 and middleware packages, from the Maximo System Information view

Answer: A

Question No: 149 – (Topic 3)

Which statement is true regarding job plan editing?

  1. An active job plan can be edited after changing its status to DRAFT.

  2. To make a change to an in-use job plan (status = ACTIVE) use the select action command to Revise Job Plan.

  3. With a job plan in the ACTIVE status, only the job plan description and responsibility sections can be updated

  4. To share a job plan with another site or organization, use the Duplicate Job Plan function from the Select Action menu and designate the duplicated job plan for the desired site or organization before saving.

Answer: B

Question No: 150 – (Topic 3)

ABC Corporation is about to deploy the IBM Maxi mo Asset Management V7.5 to manage the company assets. They want to add the GLACCOUNT attribute in the Assets application.

Since the GLACCOUNT attribute already exists in the ASSET object, what is the best approach to meet this requirement?

  1. Customize the Asset JSP file and then rebuild and redeploy the maximo.ear file

  2. In the Application Designer, add the GLACCOUNT attribute in the Assets application using a control.

  3. In the Application Designer, duplicate the Conditional User Interface to show the GLACCOUNT attribute.

  4. In the Database Configuration application, configure the GLACCOUNT attribute properties; enable the Admin Mode, and Apply Configuration Changes.

Answer: B

100% Free Download!
Download Free Demo:C2010-655 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-655 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

[Free] 2017(Sep) EnsurePass Examcollection IBM C2010-655 V13 Dumps with VCE and PDF 131-140

EnsurePass
2017 Sep IBM Official New Released C2010-655 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-655 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 131 – (Topic 2)

What is a table domain?

  1. Staticsets of values based on the values of another object

  2. Static sets of values based on the values in the table window

  3. Dynamic sets of values based on the values of another object

  4. Dynamic sets of values based on the values in the table window

Answer: C

Question No: 132 – (Topic 2)

Which statement is true about rotating items?

  1. Theyare created in the Inventory#39; application and use the Assets application to track, run actions, and contain asset detail information.

  2. They are created in the Sets application and use the Item Master application to track, run actions, and contain asset detail information.

  3. They are created in the Assets application and use the Item Master application to track, run actions, and contain asset detail information.

  4. They are created in the Item Master application and use the Assets application to track, run actions, and contain asset detail information.

Answer: D

Question No: 133 – (Topic 2)

A purchase order can be created from which three applications? (Choose three.)

  1. Assets

  2. Locations

  3. Contracts

  4. Item Master

  5. Purchase Requisitions

  6. Request for Quotations

Answer: C,E,F

Question No: 134 – (Topic 2)

When utilizing a route, the Child Work Orders option is specified. What logic does IBM Maximo Asset Management V7.5 use to assign a description tothe generated child work orders?

  1. If the route record has a description, it becomes the child work order description.

  2. If the route stop has no description and it refers to an asset, the work order description is

    the asset description.

  3. If the routestop references a job plan, the work order description is a concatenation of the job plan identifier and the job plan description.

  4. If the route stop has no description and it refers to a location, the work order description is a concatenation of thelocation identifier and location description

Answer: D

Question No: 135 – (Topic 2)

A number of items or tools have arrived at a company#39;s receiving dock from another site and include ashipping number. Which application is used to acknowledge and officially receive these items?

  1. Receipts

  2. Receiving

  3. Shipment Receiving

  4. Goods Acknowledgement

Answer: C

Question No: 136 – (Topic 2)

Where is authorization for changing general ledger component types done?

  1. Organizations application

  2. Security Groups application

  3. Chart of Accounts application

  4. Database Configuration application

Answer: B

Question No: 137 – (Topic 2)

How are reorder items designated in IBM Maximo Asset Management V7.5?

  1. The item reorder flag is set to Yesin Inventory.

  2. The item reorder flag is set to Yes in the Item Master.

  3. The item stock category is set to Stocked in Inventory.

  4. The item stock category is set to Stocked in the Item Master.

Answer: A

Question No: 138 – (Topic 2)

From the List tab of Work Order Tracking, what are three actions that can be performed on a selection of work orders or tasks? (Choose three.)

  1. Select Owner

  2. Change Status

  3. Add to Bookmarks

  4. Enter Meter Readings

  5. Assign toNew Parent

  6. Select/Deselect SLAs

Answer: A,B,E

Question No: 139 – (Topic 2)

When importing data using the Integration Framework, which property can be set to a user#39;s own e-mail for notifications?

  1. Mxe.int.email

  2. Mxe.int.emailto

  3. Mxe.int.admintoemail

  4. Mxe.int.adrninistratormail

Answer: C

Question No: 140 – (Topic 2)

Actions are accessible from which two processes or applications? (Choose two.)

  1. Workflow

  2. Escalation

  3. CronTask

  4. Email Listener

  5. Communication Template

Answer: A,B

100% Free Download!
Download Free Demo:C2010-655 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-655 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

[Free] 2017(Sep) EnsurePass Examcollection IBM C2010-655 V13 Dumps with VCE and PDF 121-130

EnsurePass
2017 Sep IBM Official New Released C2010-655 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-655 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 121 – (Topic 2)

A work order has three hours of labor charged but only one hour is reflected in the View Costs table. What is a valid explanation for this?

  1. Only one hour is anapproved labor transaction

  2. Outside labor hours are not reflected in the View Costs table

  3. Two of the hours were worked by an outside contractor so those hours are reflected as a Service

  4. The view actuals date filter is set for 30 days and two of thehours were recorded greater than 30 days ago

Answer: A

Question No: 122 – (Topic 2)

Click the Exhibit button.

Ensurepass 2017 PDF and VCE

The data field titled Reservation Type is used when planning material reservations from the Plans tab of Work Order Tracking. Which statement is true?

  1. An automatic reservation is a request for materials that is not subject to a timeframe.

  2. An automatic reservation defines the processing of the reservation based on the date the materials are required.

  3. An automatic reservation is a request for materials that is defined by the need for an item from a specific vendor.

  4. An automatic reservation takes over the stock item reorder process and automatically generates the purchase requisition.

Answer: B

Question No: 123 – (Topic 2)

Which sequence describes the procedure to report labor by contract/vendor?

  1. Open the Reporting application, select the Labor Reporttab, enter contract/vendor and labor hours

  2. Open the Labor Reporting application, select the Labor Report tab. enter contract/vendor and labor hours

  3. Open the Reporting application, select Enter by Contract/Vendor from the Select Action menu, enter labor information

  4. Open the Labor Reporting application, select Enter by Contract/Vendor from the Select Action menu, enter labor information

Answer: D

Question No: 124 – (Topic 2)

What is the purpose of a connecting line in a workflow process?

  1. To change the status of a node

  2. To branch to a workflow process

  3. To move from one node to another

  4. Toidentify who a workflow assignment will route to

Answer: C

Question No: 125 – (Topic 2)

Whichstatement correctly describes the use of the person group data type in creating a role?

  1. It is used to route a record to members of a person group.

  2. If the person data type is selected then the formation of a role is based on existing person groups.

  3. If the e-mail option is selected for the person group data type then assignments and notifications are sent to all members of the group.

  4. If the broadcast option is selected for the person group data type, then the assignment or notification is sentto either the first available group member based on calendar and shift or to the individual who is the default group assignee.

Answer: A

Question No: 126 – (Topic 2)

Which three options are available to set the reservation type on the Work Order Materialssub-tab? (Choose three.)

  1. SOFT

  2. HARD

  3. URGENT

  4. REQUIRED

  5. RESERVED

  6. AUTOMATIC

Answer: A,B,F

Question No: 127 – (Topic 2)

Which statement is true regarding reversing an invoice?

  1. The original invoice can be replaced by reversing it.

  2. An invoice can be reversed by creating a return receipt.

  3. An invoice can be reversed creating a return transaction.

  4. A three way match invoice can be reversedcreating a return transaction.

Answer: A

Question No: 128 – (Topic 2)

What does the lt;instaii homeVCTG_DE\acsi\bin\iistiu command do?

  1. displays the installed Maximo V7.5 components, from the Deployment Engine view

  2. displays the installed Maximo V7.5 components, from the Maximo System Information view

  3. displays the installed Maximo V7.5 and middleware components, from the Maximo System Information view

  4. displays the installed Maximo V7.5 and middleware installer installed components, from

the Deployment Engine view

Answer: D

Question No: 129 – (Topic 2)

What is the purpose of the Inventory Usage application?

  1. To list all inventory tool items within a storeroom

  2. To list all inventory service items within a storeroom

  3. To track the issue, transfer, and reuse of inventory items within and across sites

  4. To track the issue, transfer, and return of inventory items within and across organizations

Answer: D

Question No: 130 – (Topic 2)

Inwhich application is the default stock category set?

  1. Inventory

  2. Item Master

  3. Organizations

  4. Inventory Usage

Answer: C

100% Free Download!
Download Free Demo:C2010-655 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-655 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

[Free] 2017(Sep) EnsurePass Examcollection IBM C2010-655 V13 Dumps with VCE and PDF 111-120

EnsurePass
2017 Sep IBM Official New Released C2010-655 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-655 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 111 – (Topic 2)

What is a preventive maintenance (PM) record?

  1. Template for labor assignment

  2. Template for preventive workflow process

  3. Template for maintenance security group definition

  4. Template for scheduled preventive maintenance work

Answer: D

Explanation: Create preventive maintenance plans for work assets and locations in the Preventive Maintenance application.

You can use the Preventive Maintenance application to accomplish the following tasks:

-> Create templates, called PM records (or PMs), that are used to generate scheduled preventivemaintenance work orders.

Question No: 112 – (Topic 2)

Which data is required to apply an Item Assembly Structure (IAS) to an operating location in the Locations applications?

  1. Meter Group

  2. Failure Class

  3. Rotating Item

  4. Non-rotating Item

Answer: C

Question No: 113 – (Topic 2)

Where are the Maximo properties defined?

  1. User Properties application

  2. Report Properties application

  3. System Properties application

  4. Cron Task Propertiesapplication

Answer: C

Question No: 114 – (Topic 2)

The topology viewer contains icons to display which two kinds of information? (Choose two.)

  1. Work Indicators

  2. Detail Indicators

  3. Status Indicators

  4. Breadth Indicators

  5. Business Indicators

Answer: A,C

Question No: 115 – (Topic 2)

Which fields must be specified to define an inventory item#39;s reorder details?

  1. Reorder, Reorder Point,Safety Stock, and Order Unit

  2. Reorder, Reorder Point, Lead Time, and Primary Vendor

  3. Reorder, Reorder Point, Lead Time, and Economic Order Quantity

  4. Reorder, Reorder Point, Safety Stock, and Economic Order Quantity

Answer: C

Question No: 116 – (Topic 2)

A lease/rental contract defines the overall terms and conditionsof an agreement between a vendor and a customer related to what?

  1. Services

  2. Fixed assets

  3. Capital items

  4. Rotating assets

Answer: D

Question No: 117 – (Topic 2)

The Asset Templates application creates multiple assets at one time. At what level is the asset created?

  1. Site

  2. Item Set

  3. Database

  4. Organization

Answer: A

Question No: 118 – (Topic 2)

A user can review the meter readings history from the Assets application and which other application?

  1. Meters

  2. Meter Groups

  3. Condition Monitoring

  4. Activities and Tasks

Answer: C

Question No: 119 – (Topic 2)

When creating new Business Intelligence and Reporting Tool (BIRT) reports for use by the various IBM Maximo Asset Management applications, which step correctly describes a part of the process to add a new report?

  1. Before design files are imported, any associated library files must be imported

  2. Using the system configuration option, choose the report designer files to import

  3. Using the BIRT Report Designer Workstation, select the menu item to import the newreport

  4. Before design files are imported, the location files that specify the location of the images and report files must be populated

Answer: A

Question No: 120 – (Topic 2)

What are two validoptions for route stops? (Choose two.)

  1. Meters

  2. Assets

  3. Locations

  4. Configuration Item Records

  5. Condition Monitoring Points

Answer: B,C

100% Free Download!
Download Free Demo:C2010-655 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-655 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

[Free] 2017(Sep) EnsurePass Examcollection IBM C2010-655 V13 Dumps with VCE and PDF 101-110

EnsurePass
2017 Sep IBM Official New Released C2010-655 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-655 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 101 – (Topic 2)

For what purpose is the Activities and Tasks application used?

  1. To plan, review, and manage activities and tasks

  2. To create and manage job plans, activities, and tasks

  3. To planand manage preventive maintenance, activities, and tasks

  4. To create, plan, and manage preventive maintenance, activities, and tasks

Answer: A

Question No: 102 – (Topic 2)

CBA Corporation has deployed IBM MaximoAsset Management V7.5 (Maximo) to manage company assets. They also want to customize the Assets application and create a new field called Category. This new field should allow the user to select a value from a predefined value list. The Domain is created,the attribute and domain are already set in the Database Configuration but in the Assets application, the Category field still does not show the Detail button beside the Category field.

What is the probable cause for the Detail button not being visible?

  1. Maximo has not been restarted.

  2. The maximo.ear file has not been rebuilt and redeployed.

  3. The asset.jsp file needs to be modified to include the Lookup value.

  4. In the Assets application, the Lookup value is not defined in the Category field.

Answer: D

Question No: 103 – (Topic 2)

What is contained in a cron task instance?

  1. Name, schedule, user,activation

  2. Activation, schedule, class name, name

  3. Access level, activation, schedule, name

  4. Name, class name, activation, access level

Answer: A

Question No: 104 – (Topic 2)

Which two functions can be performed in the Quick Reporting application? (Choose two.)

  1. Create failure code hierarchies

  2. View and enter failure information

  3. Create preventivemaintenance schedules

  4. Create work orders, view work orders, and modify work orders

  5. Create work orders and plan materials, crafts, and tools required for the job

Answer: B,D

Question No: 105 – (Topic 2)

Which statement describes the purpose of the status SHIPPED on an inventory usage record?

  1. The item has been charged to the shipping department.

  2. The item has been sent to a shipper for onward transportation.

  3. The item has been removed from the inventory storeroom and is in transit to its finaldestination.

  4. The item has been issued from the inventory storeroom and has been received at its transit destination.

Answer: C

Question No: 106 – (Topic 2)

How is a Meter Group automatically applied to an asset?

  1. By attaching a condition to the asset

  2. By attaching a rotating item to the asset

  3. By attaching a stocked item to the asset

  4. By attaching a non-rotating item to the asset

Answer: B

Question No: 107 – (Topic 2)

If the Integrity Checker utility reports that some indexes are missing, which application should beused to fix this issue?

  1. Asset application

  2. Migration Manager application

  3. Database Designer application

  4. Database Configuration application

Answer: D

Question No: 108 – (Topic 2)

Which statement is correct about authorizing access to labor information for security groups in the Security Groups application?

  1. Select options to authorize labor in different groups and labor they supervise, as well as their own labor

  2. For the group to have access to all labor information, select the Authorize Group for All Labor check box

  3. For the group to have access to individual labor records, click New Row and specify values for sites and divisions

  4. For the group to haveaccess to a limited set of records, make sure the Authorize Group for All Labor check box is checked and other group check boxes are cleared

Answer: B

Question No: 109 – (Topic 2)

Where is application access defined?

  1. Rightsapplication

  2. Access application

  3. Security Groups application

  4. Application Definition application

Answer: C

Question No: 110 – (Topic 2)

What are two valid purchase contract types? (Choose two.)

  1. Price

  2. Rental

  3. Service

  4. Blanket

  5. Warranty

Answer: A,D

100% Free Download!
Download Free Demo:C2010-655 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-655 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

[Free] 2017(Sep) EnsurePass Examcollection IBM C2010-655 V13 Dumps with VCE and PDF 91-100

EnsurePass
2017 Sep IBM Official New Released C2010-655 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-655 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 91 – (Topic 2)

A failure class can be associated to which two Maximo entities? (Choosetwo.)

  1. Meters

  2. Assets

  3. Routes

  4. Locations

  5. Preventive Maintenance

Answer: B,D

Question No: 92 – (Topic 2)

When security groupsinvolve application access rights, which statement is correct when configuring IBM Maximo Asset Management V7.5?

  1. The amount of viewable data is independent of the security settings of the application. It is controlled by user privileges.

  2. Any changesthat are made within a site-level application are limited to the sites the user is currently authorized to access.

  3. When a user has access to a system-level application, any changes that are made in that application have a system-wide impact.

  4. When achange is made in an organizational-level application, the change applies to only the sites in the organization the user is currently authorized to access.

Answer: C

Question No: 93 – (Topic 2)

Which statement is true about using the Report Viewer application?

  1. It is possible to filter the list in the Report Viewer application to find the desired report output.

  2. Choose a report from the Report Administration application and click the link to the report viewer.

  3. Report content can be filtered as sensitive (requiring a Maximo login) or non-sensitive (no login required).

  4. When attempting to view the report, click the Limit Records buttonand enter the desired number of records to be returned.

Answer: A

Question No: 94 – (Topic 2)

What do relationship rules specify?

  1. The relationship between assets

  2. Groups of rules that apply to an asset

  3. The relationship between classifications

  4. Groups of rules thatapply to a relationship

Answer: D

Question No: 95 – (Topic 2)

Which IBM Maximo Asset Management V7.5 application can view labor that applies to specific requirements, or view work order requirements that fit the craft, skill level, vendor, contract, calendar availability, or shift of displayed labor?

  1. Job Plans

  2. Quick Reporting

  3. Assignment Manager

  4. Preventive Maintenance

Answer: C

Question No: 96 – (Topic 2)

Which three fields are available when creating a service request? (Choose three.)

  1. Asset

  2. Details

  3. Company

  4. Summary

  5. Storeroom

  6. Affected Location

Answer: A,B,D

Question No: 97 – (Topic 2)

To fully utilize a safety plan, what is the proper sequence to create thenecessary records?

  1. Create the lock outs, create the asset, create the work order, and then create the safety plan

  2. Create the hazard, create the precaution, create the safety plan, and then create the work order

  3. Create the hazardous material, create the safety plan, create the precautions, and then create the lock outs

  4. Create the asset, create the hazards for the asset, create the safety plan, create the tag outs, and then create the work order

Answer: B

Question No: 98 – (Topic 2)

In inventory terms a hard reservation is a request formaterials that is defined by the need for what?

  1. An item from a specific vendor

  2. An item within a specific timeframe

  3. An item based on the current balance

  4. An item based on the work order priority

Answer: B

Question No: 99 – (Topic 2)

How are IBM Maximo Asset Management V7.5 (Maximo) properties changed while Maximo is running?

  1. Live Refresh action item in the Logging Properties application

  2. Live Refresh action item in the System Properties application

  3. Apply Settings action item in the System Properties application

  4. Apply Settings action item in the Logging Properties application

Answer: B

Question No: 100 – (Topic 2)

How can a document be included in an e-mail sent from a communication template?

  1. On the Attachment Folders tab, check the Include box

  2. Onthe Create Communication dialog, select attachments to send

  3. On the Linked Documents tab, check the Send with Communication box

  4. On the Communication Template tab, click Attachments and select a document

Answer: D

100% Free Download!
Download Free Demo:C2010-655 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-655 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

[Free] 2017(Sep) EnsurePass Examcollection IBM C2010-655 V13 Dumps with VCE and PDF 81-90

EnsurePass
2017 Sep IBM Official New Released C2010-655 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-655 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 81 – (Topic 2)

Which statement is true about scheduling an escalation in IBM Maximo Asset Management V7.5 (Maximo)?

  1. Maximoperforms escalations every hour.

  2. Maximo performs escalations on time intervals.

  3. Maximo monitors the database when scheduled.

  4. Maximo performs the escalation action when scheduled.

Answer: C

Question No: 82 – (Topic 2)

How can a preventive maintenance (PM) record be excluded from a PM forecast in the Preventive Maintenance application?

  1. Change the status of the PM to NONSCHED

  2. Select theoption: Exclude this PM in the Forecast

  3. Deselect the option: Include this PM in the Forecast

  4. Select Delete Forecast from the Select Action menu

Answer: C

Question No: 83 – (Topic 2)

Which three statements are trueregarding returning assets to a vendor? (Choose three.)

  1. Rotating assets cannot be returned to a vendor.

  2. A direct issue item can be returned if it is moved.

  3. A direct issue item cannot be returned if it is moved.

  4. Assets must be returned from thereceiving storeroom.

  5. An asset#39;s inventory cost must equal the reversing line cost.

  6. An asset#39;s inventory cost must not equal the reversing line cost.

Answer: C,D,E

Question No: 84 – (Topic 2)

Where are labor option settings defined?

  1. Sites application

  2. Labor application

  3. Person application

  4. Organizations application

Answer: D

Question No: 85 – (Topic 2)

A job plan is used throughout the organization and has six tasks except for one site (site A) that has an additional task. What is the best approach to accomplish this requirement?

  1. Create a job plan with the six tasks that apply to both sites. Createa nested job plan that references the unique task, designate it for site A and associate it with the first task.

  2. For the job plan or tasks, do not define an organization or site. When the work order for a site other than site A is created, delete the task which does not apply from the work order.

  3. For the job plan or the six tasks that apply to both sites, do not define an organization or site. For the additional task that is specific for site A, designate the site ID for that task as site A.

  4. Two job plans are needed: one that is designated as site A at the job plan level and has the seven appropriate job tasks for that site, and one without a defined site for the six job

tasks appropriate for the remaining sites.

Answer: C

Question No: 86 – (Topic 2)

Which statement is true regarding the escalation cron task?

  1. It must have an execution entry.

  2. It runs all active escalations every 30 seconds.

  3. It runs all active escalation definitions at a set schedule

  4. It uses the SQL Expression Builder to retrieve records from the database

Answer: C

Question No: 87 – (Topic 2)

Which statement about commitments is true when creating a Service Level Agreement (SLA)?

  1. The default commitment is Availability.

  2. An SLA can specify multiple types of commitments.

  3. When attaching a commitment to a SLA, the SLA features a single escalation instruction.

  4. When specifying any of the default types of commitments, the values to be specified include Level and Designation.

Answer: B

Question No: 88 – (Topic 2)

What IBM Maximo Asset Management V7.5 functionality hides and shows fields in the applications based on user groups and on theevaluation of one or more conditions?

  1. JSP files

  2. Conditional group

  3. Conditional User Interface

  4. User Interface properties file

Answer: C

Question No: 89 – (Topic 2)

A shipment is being received for a rotating item or tool. What is the next step in receiving a rotating tool or item when the status is WINSP?

  1. Assign Asset Number

  2. Receive Rotating Items

  3. Receive Inspected Items

  4. Change Inspection Status for Rotating Items

Answer: D

Question No: 90 – (Topic 2)

How is Assignment Manager used?

  1. To assign PMs to a site

  2. To assign users to securitygroups

  3. To dispatch assignments from a workflow process

  4. To dispatch labor and schedule work for the organization

Answer: D

100% Free Download!
Download Free Demo:C2010-655 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-655 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

[Free] 2017(Sep) EnsurePass Examcollection IBM C2010-655 V13 Dumps with VCE and PDF 71-80

EnsurePass
2017 Sep IBM Official New Released C2010-655 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-655 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 71 – (Topic 1)

What is a valid report option in the Labor Reporting application for external contractors or internal employees?

  1. Reporting labor by site

  2. Reporting labor by contract

  3. Reporting labor by work order

  4. Reporting labor by organization

Answer: C

Topic 2, Volume B

Question No: 72 – (Topic 2)

Which statement is true regarding job plan editing?

  1. Job plans with a status of DRAFT or PNDREV may be edited.

  2. Job plans can never be edited once they have been revised (revision number gt; 0).

  3. To edit a job plan, use the select action command to Revise Job Plan. This action cancels the initial job plan, creating an editable copy in the REVISED status.

  4. To designate a job plan for a different organization or site, use the select action command to Revise Job Plan and then change the organization or site identifier.

Answer: A

Question No: 73 – (Topic 2)

What is the initial default statuswhen creating a Request for Quotation?

  1. INPRG

  2. DRAFT

  3. WAPPR

  4. INACTIVE

Answer: A

Question No: 74 – (Topic 2)

Which statement is true about a master preventive maintenance (PM) record?

  1. A master PM record does not generate work orders.

  2. Associated PM records cannot be created from master PM records.

  3. A master PM record generates work orders like any other PM records.

  4. Associations between existing PM records and a master PM record cannot be made

Answer: A

Question No: 75 – (Topic 2)

What task must be performed as part of initial data entry?

  1. Create Tool

  2. CreateCraft

  3. Create Order

  4. Create Organization

Answer: D

Question No: 76 – (Topic 2)

Where are documents added to IBM Maximo Asset Management V7.5?

  1. Manage Files Select Action from the application that allows attached documents

  2. Manage Library Select Action from the application that allows attached documents

  3. Manage Folders Select Action from the application that allows attached documents

  4. Manage Documents Select Action from the application that allows attached documents

Answer: B

Question No: 77 – (Topic 2)

Which application is used to add more values in the Work Type list?

  1. Domains

  2. Organizations

  3. WorkOrder Tracking

  4. Database Configuration

Answer: B

Question No: 78 – (Topic 2)

What is the main purpose of the Job Plan Sequence tab in the Preventive Maintenance (PM) application?

  1. To assign a sequential list of PM job plans which allows for schedulingdifferent levels of maintenance work

  2. To schedule a sequence of PM records during specified times of the year including active PM days, weeks, or months

  3. To schedule criteria for sequencing work order generation from PM records in which PMs can be scheduled time-based or meter-based

  4. To generate a group sequence of PM work orders for an asset or location hierarchy which allows for organizing job plans for inspections and large projects

Answer: A

Question No: 79 – (Topic 2)

How is a kit item used?

  1. To group items by classification

  2. To order a set of related commodity codes

  3. To store a group of items for project staging

  4. To maintain and issue a specific list of items

Answer: D

Question No: 80 – (Topic 2)

Where are inventory cost options defined?

  1. Sites application

  2. Inventory application

  3. Item Master application

  4. Organizations application

Answer: D

100% Free Download!
Download Free Demo:C2010-655 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-655 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

[Free] 2017(Sep) EnsurePass Examcollection IBM C2010-655 V13 Dumps with VCE and PDF 61-70

EnsurePass
2017 Sep IBM Official New Released C2010-655 V13
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-655 V13.html

IBM Maximo Asset Management V7.5 Implemenation

Question No: 61 – (Topic 1)

How is a cron task instance run?

  1. Define a schedule and set to Active

  2. Set to Active and turn Admin mode on

  3. Define a schedule and set the parameters

  4. Turn Admin mode on and define a schedule

Answer: A

Question No: 62 – (Topic 1)

When defining new reports in the various IBM Maximo Asset Management applications, which statement is true about browser shortcuts created for those reports?

  1. Shortcuts can becreated as hyperlinks

  2. Shortcuts can be created for any report

  3. Shortcuts can be created in the Application Designer

  4. Shortcuts can be created for a report that has no parameters

Answer: D

Question No: 63 – (Topic 1)

Which three are valid Request for Quotation statuses? (Choose three.)

  1. APPR

  2. COMP

  3. INPRG

  4. DRAFT

  5. READY

  6. WAPPR

Answer: B,C,E

Question No: 64 – (Topic 1)

Which statement describes how an inventory backorder reservation type is set?

  1. Run the reorderprocess and enable the Backorder check box

  2. Enable Backorder as a reservation type with the Work Order – Materials sub-tab

  3. Enable Disallow Negative Available Balance in Organizations gt; Inventory Options gt; Inventory Defaults

  4. Select an item with a current balance less than the quantity ordered in the Work Order- Materials sub-tab

Answer: C

Question No: 65 – (Topic 1)

Which domain types can be added?

  1. Synonym, Internal, ALN

  2. Numeric, Crossover, Table

  3. ALN, Crossover, Synonym

  4. Synonym, Table, Crossover

Answer: B

Question No: 66 – (Topic 1)

When using the Asset Templates application to update existing assets, what preventsdata from being overwritten when applying the template?

  1. Leave the fields blank

  2. Modify the Site options

  3. Modify the Organization options

  4. Check the Update Existing fields checkbox

Answer: A

Question No: 67 – (Topic 1)

What does an active workflow process define?

  1. The flow of work in Application Designer

  2. The process to add an attribute to an application

  3. The different work to be performed by the lead craft

  4. The different paths that a record can take as it moves through a business process

Answer: D

Explanation: You use the Workflow Designer application to create, to view, to modify, and to delete workflow process records that reflect your business processes.

An active workflow process defines the different paths that a record can take as it moves through a business process. The workflow process also specifies the actions and notifications that can take place at different points in a process.

Question No: 68 – (Topic 1)

What are two ways an administrator can add an existing attribute to the Work Order Tracking application? (Choose two.)

  1. Conditional Ul application gt; select WOTRACK, select the new attribute, click the Show button

  2. Database Configuration application gt; select WORKORDER object, select the new attribute, click the Show button

  3. Application Designer application gt; under Select Action menu select the Add/Modify Attributes option, add the new attribute to the canvas

  4. Application Designer application gt; select WOTRACK, drag and drop the appropriatecontrol to the canvas, configure the control properties to bind the new attribute

  5. Application Designer application gt; select WOTRACK application, export the presentation XML file, make appropriate changes in the XML file, import the presentation XML file

Answer: D,E

Question No: 69 – (Topic 1)

Which statement describes the function of the Select Items for Return button?

  1. toreturn excess inventory items to another storeroom bin

  2. to return inventory items to a storeroom found in the workshop

  3. to return issued but unused inventory items to another storeroom

  4. to return issued but unused inventory items to the original storeroom

Answer: D

Question No: 70 – (Topic 1)

What is a Work Order?

  1. Request for route stop

  2. Request for inventory reorder

  3. Request for work to be performed

  4. Request for user accessto application

Answer: C

100% Free Download!
Download Free Demo:C2010-655 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2010-655 V13 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE