[Free] 2017(Oct) EnsurePass Pass4sure Microsoft MB6-886 Dumps with VCE and PDF 1-10

EnsurePass
2017 Oct Microsoft Official New Released MB6-886
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/MB6-886.html

Microsoft Dynamics AX 2012 Process Manufacturing Production and Logistics

Question No: 1

Which of the following are valid actions for the approved vendor list (AVL) in Microsoft Dynamics AX 2012? (Each correct answer is a complete solution. Choose three.)

  1. Delete an approved vendor from an item.

  2. Add an approved vendor to an item.

  3. Change the end date for an approved vendor.

  4. Mark an approved vendor as Pending.

Answer: A,B,C

Question No: 2

Which of the following template item properties will transfer to a new item that has been created by using a product template? (Each correct answer presents a complete solution. Choose three.)

  1. approved vendor list (AVL) check method

  2. catch weight unit

  3. shelf-life period in days

  4. yield percent

Answer: A,C,D

Question No: 3

In which of the following locations can Document Attachment source documents be stored? Choose the 2 that apply.

  1. on each user local workstation on each user? local workstation

  2. in a Microsoft SharePoint document library

  3. in a network folder

  4. in a table in the Application database

Answer: B,C

Question No: 4

You need to ensure that inventory is automatically reserved for sales orders based on customer-specific requirements. What should you do? (Each correct answer presents part of the solution. Choose three.)

  1. Select the Auto batch reservation option.

  2. Define only customer-specific batch attributes.

  3. Define product-specific customer-specific batch attributes.

  4. Configure the Accounts Receivable parameters for automatic reservation.

  5. Configure the SalesMarketing parameters for automatic reservation.

Answer: A,C,D

Question No: 5

What does pressing the F9 key do in Microsoft Dynamics SL?

  1. edits a field in grid view

  2. opens Microsoft Dynamics SL Help

  3. opens the Notes window

  4. enters a formula in a date or period field

Answer: C

Question No: 6

In Microsoft Dynamics AX 2012which of the following describes a reported product?

  1. An item that requires continuous compliance.

  2. An item that is sourced through intercompany planning.

  3. An item with distribution that is limited or constrained by a government authority.

  4. An item that is regulated by national regional and local authorities.

Answer: D

Question No: 7

You are planning for the replenishment of shelf-life items in Microsoft Dynamics AX 2012.

Which of the following requirements must be met?

  1. The Consider shelf life option must be selected on the master plan.

  2. Items must be formula items.

  3. Items must be serial-controlled items.

  4. The coverage group隆炉s coverage code must be set to Shelf life.

Answer: A

Question No: 8

What takes precedence over the reservation performed in the shipment entity in advanced warehouse management in Microsoft Dynamics AX 2012?

  1. a warehouse reservation performed in shipments

  2. a batch reservation performed from the sales order line

  3. a warehouse reservation performed in a location

  4. an inventory reservation performed from the sales order line

Answer: C

Question No: 9

Which of the following manufacturing requirements does process manufacturing address?

  1. batch production

  2. contract manufacturing

  3. Lean manufacturing

  4. engineer to order

Answer: D

Question No: 10

You set up an approved vendor list (AVL) check method of Not allowed in Microsoft Dynamics AX 2012. There are no approved vendors for the item. You attempt to select a vendor for a planned purchase order. What is the result?

  1. A message states that the vendor is not in the approved vendor list and the transaction is aborted.

  2. A message states that the vendor is not in the approved vendor list and you can continue the transaction.

  3. A message states that the vendor code is not approved for this item and you cannot firm the planned order.

  4. A message states that no check has been performed.

Answer: A

100% Free Download!
Download Free Demo:MB6-886 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass MB6-886 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

Leave a Reply

Your email address will not be published. Required fields are marked *