Microsoft Dynamics AX 2012 Lean Manufacturing

Question No: 41 – (Topic 1)

What is created from a purchase agreement to signal demand for a product or service provided by a subcontractor in Microsoft Dynamics AX 2012?

  1. manufacturing Kanban

  2. sales order

  3. event Kanban

  4. release order

Answer: A

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 44.

Question No: 42 – (Topic 1)

Which of the following are Lean manufacturing-related inventory transaction types in Microsoft Dynamics AX 2012? (Each answer presents a complete solution. Choose three.)

  1. Kanban process job

  2. Kanban job consumption

  3. Kanban emptied

  4. Kanban process card issue

  5. Kanban card consumption

Answer: A,C,D

Question No: 43 – (Topic 1)

From where can you manually create an event Kanban for Kanban line events? (Each correct answer presents a complete solution. Choose two.)

  1. pegging tree

  2. sales order line

  3. Kanban board for process jobs form

  4. Kanban rules form

Answer: C,D

Reference:

http://msdn.microsoft.com/en-us/subscriptions/hh781101.aspx http://msdn.microsoft.com/en-us/subscriptions/hh227370.aspx

Question No: 44 – (Topic 1)

On which Microsoft Dynamics AX 2012 element are the input and output warehouse and location for a work cell specified?

  1. activity

  2. production flow model

  3. Kanban

  4. resource group

Answer: D

Reference:

http://technet.microsoft.com/en-us/library/hh208503.aspx

Question No: 45 – (Topic 1)

You are using automated planning in Microsoft Dynamics AX 2012.

You need to limit the number of automatically created scheduled Kanbans. What should you do?

  1. Set the Maximum planned jobs value.

  2. Select the Product quantity variance check box and set the Automatic planning quantity value.

  3. Set the Automatic planning quantity value and override the Firming time fence value.

  4. Set the Automatic planning quantity and Firming time fence values.

Answer: A

Reference:

http://msdn.microsoft.com/en-us/subscriptions/hh850371.aspx

Question No: 46 – (Topic 1)

You are setting up a production flow in Microsoft Dynamics AX 2012. You assign two production flow versions to the production flow. You need to activate both versions of the production flow.

What must be true so that you can successfully activate both versions?

  1. The periods between the effective date and the expiration date in the two versions do not overlap.

  2. One version has both the effective date and the expiration date defined, and the other version has a value defined for the expiration date, but no value defined for the effective date.

  3. The periods between the effective date and the expiration date in the two versions overlap, but the Period for actual cycle time (days)values are different.

  4. The periods between the effective date and the expiration date in the two versions overlap, but the Maximum takt time values are different.

Answer: A

Reference:

http://technet.microsoft.com/en- us/library/hh527161.aspx#Activate_the_production_flow_version

Question No: 47 – (Topic 1)

In Microsoft Dynamics AX 2012, when is the futures date on a planned Kanban used as the requirement date?

  1. When the futures message Desired date is earlier than or the same as the action message To date.

  2. When the futures message is deleted.

  3. When the futures message To date is earlier than or the same as the action message To date.

  4. Whenthe futures message is activated.

Answer: A

Reference:

http://msdn.microsoft.com/en-us/subscriptions/aa620351.aspx

Question No: 48 – (Topic 1)

You are creating event Kanban rules in Microsoft Dynamics AX 2012.

You need to replenish material that is required for a downstream process activity. Which event type should you activate?

  1. Kanban line event

  2. stock replenishment event

  3. sales event

  4. BOM line event

Answer: A

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p 8.

Topic 2, VolumeB

Question No: 49 – (Topic 2)

Which of the following are Kanban types in Microsoft Dynamics AX 2012? (Each correct answer presents a complete solution. Choose two.)

  1. Fixed Quantity

  2. Manufacturing

  3. Withdrawal

  4. scheduled

Answer: B,C

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p 6.

Question No: 50 – (Topic 2)

Which Lean manufacturing concept establishes a production context and a cost context for the Microsoft Dynamics AX 2012 Kanban scenarios?

  1. Capable to Promise (CTP)

  2. mixed mode manufacturing

  3. production flows

  4. semi-finished products

Answer: C

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 6.

100% Free Download!
Download Free Demo:MB6-884 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass MB6-884 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

Leave a Reply

Your email address will not be published. Required fields are marked *