Question No: 31 – (Topic 1)

Which of the following actions can be performed when processing with the supply schedule in Microsoft Dynamics AX 2012? (Each correct answer presents a complete solution.

Choose three.)

  1. create a new scheduled Kanban

  2. create a new planned order

  3. run Master Scheduling

  4. delete planned orders

  5. link a Kanban rule to a production flow

Answer: A,B,C

Reference:

http://dynamicscare.com/blog/index.php/using-the-supply-schedule-in-dynamics-ax-2012/

Question No: 32 – (Topic 1)

You create a project flow activity and select the option to register scrap. Where do you define the scrap factor that will be applied on backflushing?

  1. in the inventory and warehouse parameters

  2. in the production control parameters

  3. in the BOM lines

  4. in the product masters

Answer: C

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 11.

http://technet.microsoft.com/EN-US/library/aa558446

Question No: 33 – (Topic 1)

When a manufacturing Kanban job is reported as complete, which of the following values may be specified? (Each correct answer presents a complete solution. Choose three.)

  1. good quantity

  2. first time through designation

  3. product dimensions

  4. error quantity

  5. output warehouse/location

Answer: A,B,D

Reference:

http://msdn.microsoft.com/en-us/subscriptions/hh699643.aspx

Question No: 34 – (Topic 1)

Which of the following are valid statuses for a Kanban quantity calculation? (Each correct answer presents a complete solution. Choose three.)

  1. Completed

  2. Calculated

  3. Planned

  4. Created

  5. Updated

Answer: B,D,E

Reference:

http://msdn.microsoft.com/en-us/subscriptions/hh597101.aspx

Question No: 35 – (Topic 1)

An inventory controlled withdrawal Kanban is posted between two sites in the same legal entity.

Which cost is used to post transactions in the receiving organization?

  1. last cost for the receiving organization

  2. standard cost for the receiving organization

  3. last cost for the shipping organization

  4. standard cost for the shipping organization

Answer: B

Question No: 36 – (Topic 1)

A manufacturing Kanban is reported as complete for a product whose receipt type is inventory controlled. To which ledger accounts does the transaction post?

  1. Work in Process (WIP) and Product inventory

  2. Product Inventory and Product Inventory

  3. Product Inventory and Cost of Goods Sold (COGS)

  4. Work In Process (WIP) and Cost of Goods Sold (COGS)

Answer: A

Question No: 37 – (Topic 1)

Which of the following are Kanban replenishment strategies in Microsoft Dynamics AX 2012? (Each correct answer presents a complete solution. Choose three.)

  1. Fixed Quantity

  2. Event

  3. Classic

  4. One-Card

  5. Scheduled

Answer: A,B,E

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p6-7.

Question No: 38 – (Topic 1)

In Microsoft Dynamics AX 2012, what is the job status of a transfer Kanban job before it has been started?

  1. In progress

  2. Planned

  3. Not planned

  4. Prepared

Answer: C

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p29.

Question No: 39 – (Topic 1)

Which inventory model must you use for all production flow-related products other than withdrawal Kanbans?

  1. Weighted avg.

  2. LIFO

  3. FIFO

  4. standard cost

Answer: D

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 34.

Question No: 40 – (Topic 1)

You need to assign service terms to a production flow activity in Microsoft Dynamics AX 2012.

What must you do first?

  1. Attach at least one vendor resource to the production flow.

  2. Attach a resource group containing at least one vendor resource to the production flow.

  3. Attach at least one vendor resource to the production flow activity.

  4. Attach a resource group containing at least one vendor resource to the production flow activity.

Answer: B

Reference:

http://dynamicscare.com/blog/index.php/activity-based-subcontracting/ http://technet.microsoft.com/en-us/library/hh208503.aspx

100% Free Download!
Download Free Demo:MB6-884 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass MB6-884 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE

Leave a Reply

Your email address will not be published. Required fields are marked *